4040 Civic Center

San Rafael, CA

Team Members

Architect:

Hannum Associates

Building Owner:

James Campbell Estate

Construction Manager:

Kathy Mattes

Engineer:

Pinnacle Engineering Consultants

Highlights

  • 5-story building remodel
  • Existing lobby demolished down to grade and relocated to the other side of the building
  • New utilities, landscaping, mechanical system, elevators and stairwells
  • Over 30 interior projects completed since remodel
  • 200,000 square feet
  • 4040 civic center
  • 4040 civic center

“Trust and communication were key”

—Tracy Coletta, Director Of Operations

Biggest Challenge:

4 months of non-stop rain

Details:

We implemented the core and shell work during record rains and the wettest winter in 20 years. It rained nine out of ten days, for four months straight. There were extensive changes to the building elevation and architectural features. We hauled truckloads of mud and relocated a parking lot, among numerous other projects. The project was intense and we were challenged to meet the schedule so the tenants could occupy the building. However, everyone was on the same page and a strong relationship with the client and construction manager helped move the project along.

Our Company

Case Studies

Stupski Foundation

Mill Valley, CA

Union Bank of San Ramon

San Ramon, CA

CV Partners

San Francisco, CA

Vitra

Santa Monica, CA

Nordstrom / Façonnable

Costa Mesa, CA

Franco Sarto

San Francisco, CA

Atlantic Records

Hollywood, CA

Arns Law Firm

San Francisco, CA

NT Audio

Hollywood, CA

4040 Civic Center

San Rafael, CA

Information Technology

Various locations

Transamerica Pyramid Lobby

San Francisco, CA

Howard Rice

San Francisco, CA

Transamerica Pyramid Center

San Francisco, CA

View All Case Studies

Client List